Flood Monitoring Section

  • PDF
  • Print

Objective of Flood Management Section

To ensure the operation of flood control at Operation Control Room is function all the time 24 hours x 7 days as it design with:

  • To carry out the operation of flood control at Operation Control Room with to trace, warning and flood forecast according to Standard Operating Procedure.
  • To carry out valuation of hydrology station and main control structure of FDS SMART system performance.
  • To coordinate the management of information technology and communication program at SMART Control Centre.

Click here for organizational chart

 

Statistik Mod 2017

Mod 2:17
Mod 3: 1
Mod 4: 0

Jumlah Mod : 18

Statistics of Visitor

mod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_counter
mod_vvisit_counterToday154
mod_vvisit_counterYesterday125
mod_vvisit_counterThis week962
mod_vvisit_counterLast week726
mod_vvisit_counterThis month2529
mod_vvisit_counterLast month4631
mod_vvisit_counterAll days1599565

We have: 10 guests, 1 bots online
Your IP: 54.158.238.172
 , 
Today: Jul 20, 2017
Free Joomla 1.5 Templates by JoomlaShine.com