HomeServicesComponents of SMART

Components of Stormwater Management System

  • PDF
  • Print


  1. Diversion weir, offtake structure, tunnel intake, tunnel outfall
  2. Holding Pond at Kampung Berembang.
  3. Bypass tunnel - diameter 11.8m, 9.7km from Kg. Berembang, Ampang to Taman Desa.
  4. 3km double-deck motorway in the middle of tunnel.
  5. Storage Reservoir at Taman Desa.
  6. Twin Box Culvert Outlet Structure.
  7. 'Ingress & Engress Connections' connecting the KL-Seremban Highway, Jalan Tun Razak and Jalan Sultan Ismail.
  8. SMART Control Centre equipped with SCADA System and Flood Detection System for Flood Discharge and Traffic.

 

Layout Plan of SMART Stormwater Diversion Tunnel

 

Statistik Mod 2017

Mod 2:3
Mod 3: 0
Mod 4: 0

Jumlah Mod : 3

Statistics of Visitor

mod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_counter
mod_vvisit_counterToday114
mod_vvisit_counterYesterday197
mod_vvisit_counterThis week626
mod_vvisit_counterLast week1350
mod_vvisit_counterThis month5443
mod_vvisit_counterLast month3176
mod_vvisit_counterAll days1403648

We have: 19 guests, 2 bots online
Your IP: 54.167.135.61
 , 
Today: Mar 29, 2017
Free Joomla 1.5 Templates by JoomlaShine.com