HomeServicesComponents of SMART

Components of Stormwater Management System

  • PDF
  • Print


  1. Diversion weir, offtake structure, tunnel intake, tunnel outfall
  2. Holding Pond at Kampung Berembang.
  3. Bypass tunnel - diameter 11.8m, 9.7km from Kg. Berembang, Ampang to Taman Desa.
  4. 3km double-deck motorway in the middle of tunnel.
  5. Storage Reservoir at Taman Desa.
  6. Twin Box Culvert Outlet Structure.
  7. 'Ingress & Engress Connections' connecting the KL-Seremban Highway, Jalan Tun Razak and Jalan Sultan Ismail.
  8. SMART Control Centre equipped with SCADA System and Flood Detection System for Flood Discharge and Traffic.

 

Layout Plan of SMART Stormwater Diversion Tunnel

 

Statistik Mod 2017

Mod 2:17
Mod 3: 1
Mod 4: 0

Jumlah Mod : 18

Statistics of Visitor

mod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_counter
mod_vvisit_counterToday159
mod_vvisit_counterYesterday125
mod_vvisit_counterThis week967
mod_vvisit_counterLast week726
mod_vvisit_counterThis month2534
mod_vvisit_counterLast month4631
mod_vvisit_counterAll days1599570

We have: 15 guests, 1 bots online
Your IP: 54.158.238.172
 , 
Today: Jul 20, 2017
Free Joomla 1.5 Templates by JoomlaShine.com