TARIKH IKLAN : 03 FEBRUARI 2022
1. JPS WPKL(SH)/SMART/01/2022
KERJA-KERJA PEMBERSIHAN KELODAK SERTA BERKAITAN DENGANNYA DI STRUKTUR TUNNEL OUTFALL, KOLAM TAKUNGAN TAMAN DESA, PUSAT KAWALAN SMART, JABATAN PENGAIRAN DAN SALIRAN WILAYAH PERSEKUTUAN KUALA LUMPUR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : ISFA JAYA SERVICES
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 24 MINGGU
NILAI : RM 425,480.00
2. JPS WPKL(SH)/SMART/02/2022
KERJA-KERJA PEMBAIKAN DAN PENYELENGGARAAN SISTEM PERPAIPAN DI KAWASAN KOLAM TAKUNGAN BANJIR TAMAN DESA, PUSAT KAWALAN SMART, JABATAN PENGAIRAN DAN SALIRAN WILAYAH PERSEKUTUAN KUALA LUMPUR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : NAS RESOURCES
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 12 MINGGU
NILAI : RM 173,600.00
3. JPS WPKL(SH)/P/16/2022
KERJA MEMBAIKPULIH TEBING SUNGAI BATU YANG RUNTUH BERHAMPIRAN PERODUA JALAN IPOH, WILAYAH PERSEKUTUAN KUALA LUMPUR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : CUBIC SPHERE SDN BHD
TARIKH KEPUTUSAN : MAC 2022
TEMPOH SIAP : 12 MINGGU
NILAI : RM 664,203.00
4. JPS WPKL(SH)/P/17/2022
KERJA MENGOREK DAN MEMBUANG KELODAK DI KOLAM TAKUNGAN BANJIR MIDAH, WILAYAH PERSEKUTUAN KUALA LUMPUR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : AMAN RAHIM ENTERPRISE
TARIKH KEPUTUSAN : MAC 2022
TEMPOH SIAP : 16 MINGGU
NILAI : RM 653,350.00
5. JPS WPKL(SH)/P/18/2022
KERJA MEMBAIKPULIH TEBING SUNGAI KLANG BERHAMPIRAN JAMBATAN JALAN KLANG LAMA DAN TAMAN SRI PANDAN, WILAYAH PERSEKUTUAN KUALA LUMPUR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : RAZQI REEN RESOURCES
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 12 MINGGU
NILAI : RM 660,585.00
6. JPS WPKL(SH)/P/19/2022
KERJA MEMBAIKPULIH BERM TEBING KIRI SUNGAI BATU BERHAMPIRAN STESEN HIDROLOGI JALAN IPOH, WILAYAH PERSEKUTUAN KUALA LUMPUR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : SEMESTA BAYU SDN BHD
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 12 MINGGU
NILAI : RM 653,940.00
7. JPS WPKL(SH)/P/20/2022
KERJA MEMBAIKPULIH BERM TEBING KANAN SUNGAI BATU BERHAMPIRAN JALAN PELANGI INDAH OFF JALAN IPOH, WILAYAH PERSEKUTUAN KUALA LUMPUR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : DAYA INTEGRATED
TARIKH KEPUTUSAN : MAC 2022
TEMPOH SIAP : 12 MINGGU
NILAI : RM 652,126.00
TARIKH IKLAN TENDER : 07 FEBRUARI 2022
1. JPSWPKL/ME/01/2022
KERJA-KERJA PEMASANGAN DAN INTEGRASI SISTEM SCADA SERTA KERJA-KERJA LAIN YANG BERKAITAN UNTUK RANCANGAN TEBATAN BANJIR SUNGAI BUNUS WILAYAH PERSEKUTUAN KUALA LUMPUR
GRED : G5
PENGKHUSUSAN : M23
| IKLAN | JADUAL TENDER KERJA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : KEJURUTERAAN ELMEK SDN BHD
TARIKH KEPUTUSAN : MEI 2022
TEMPOH SIAP : 18 BULAN
NILAI : RM 4,186,088.00
TARIKH IKLAN : 11 FEBRUARI 2022
1. JPS WPKL(SH)/P/06/2022
KERJA MEMBAIKPULIH TEBING SUNGAI BERHAMPIRAN TAMAN HOCK ANN (PERTEMUAN SUNGAI KERAYONG DAN SUNGAI KLANG), WILAYAH PERSEKUTUAN KUALA LUMPUR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : MAHLIGAI SERIMAS SDN BHD
TARIKH KEPUTUSAN : MAC 2022
TEMPOH SIAP : 12 MINGGU
NILAI : RM 611,117.00
2. JPS WPKL(SH)/P/21/2022
KERJA MENGOREK DAN MEMBUANG KELODAK DI SUNGAI GOMBAK DARI STESEN LRT TITIWANGSA HINGGA KE SEKOLAH RENDAH SERI PERAK, WILAYAH PERSEKUTUAN KUALA LUMPUR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : CONVOLUTION M&E ENGINEERING
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 12 MINGGU
NILAI : RM 606,528.00
3. JPS WPKL(SH)/P/22/2022
KERJA MENGOREK DAN MEMBUANG KELODAK DI KOLAM TAKUNGAN KAMPUNG BENTENG (BENTENG 2), WILAYAH PERSEKUTUAN KUALA LUMPUR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : NDS DZUL ENTERPRISE
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 12 MINGGU
NILAI : RM 652,582.00
4. JPS WPKL(SH)/P/23/2022
KERJA MEMBAIKPULIH TEBING SUNGAI KUYOH BERHAMPIRAN RESIDENSI PUCHONG MAS, WILAYAH PERSEKUTUAN KUALA LUMPUR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : NRZ TEGUH ENTERPRISE
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 12 MINGGU
NILAI : RM 616,940.00
5. JPS WPKL(SH)/P/24/2022
KERJA MEMBAIKPULIH TEBING KIRI SUNGAI BATU BERHAMPIRAN SEKOLAH MENENGAH SAINS PUTERI, WILAYAH PERSEKUTUAN KUALA LUMPUR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : GERHANA RESOURCES
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 12 MINGGU
NILAI : RM 669,276.00
TARIKH IKLAN : 16 FEBRUARI 2022
1. JPS WPKL (SH)/SMART/03/2022
KERJA-KERJA PEMBAIKAN OUTDOOR UNIT SISTEM PENYAMAN UDARA JENIS VARIABLE REFRIGERANT VOLUME (SISTEM R1) DI PUSAT KAWALAN SMART
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : ERISALL ENTERPRISE
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 11 MINGGU
NILAI : RM 138, 980.00
TARIKH IKLAN : 17 FEBRUARI 2022
1. JPS (SH)/PLSK/07/2022
KERJA-KERJA MENDALAMKAN SG. BATU BERMULA DARI KOLAM STILLING BASIN HINGGA KE JAMBATAN RUMAH PAM SG. BATU SERTA KERJA-KERJA BERKAITAN
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : CS GLOBAL VENTURES
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 8 MINGGU
NILAI : RM 302, 286.40
TARIKH IKLAN : 18 FEBRUARI 2022
1. JPS WPKL (SH)/PLSK/05/2022
KERJA-KERJA MENAIKTARAF PAGAR KESELAMATAN SI LENCONGAN GOMBAK, SERTA KERJA-KERJA YANG BERKAITAN
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : DAYA MURNI ENTERPRISE
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 10 MINGGU
NILAI : RM 210, 250.00
2. JPS WPKL (SH)/PLSK/20/2022
KERJA-KERJA MENAIKTARAF SISTEM CCTV BAGI TUJUAN PEMANTAUAN OPERASI LOJI SECARA ONLINE DI 13 RWTP DAN KERJA-KERJA LAIN YANG BERKAITAN
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : FITRAY ABL ENTERPRISE
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 4 BULAN
NILAI : RM 184, 023.00
3. JPS WPKL (SH)/P/25/2022
KERJA MEMBAIKPULIH TEBING KANAN SUNGAI KUYOH BERHAMPIRAN TAMAN SRI PANDYAN, WILAYAH PERSEKUTUAN KUALA LUMPUR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : ALFA KENCHANA VISION
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 12 MINGGU
NILAI : RM 668,460.00
4. JPS WPKL (SH)/P/27/2022
KERJA MEMBAIKPULIH BERM TEBING KIRI SUNGAI KLANG BERHAMPIRAN APARTMEN ABDULLAH HUKUM, WILAYAH PERSEKUTUAN KUALA LUMPUR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : WHA ENGINEERING
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 12 MINGGU
NILAI : RM 654,325.00
5. JPS WPKL (SH)/PLSK/24/2022
KERJA-KERJA MENAIKTARAF STRUKTUR PERUMAH DAN BIOMEDIA JENIS PLASTIC BOTTLE (VITAGEN SHAPE) DI RWTP BATU 2 BAGI PROJEK RIVER OF LIFE (ROL) TERMASUK KERJA-KERJA BERKAITAN
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : GLOBAL BUSINESS RESOURCES
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 24 MINGGU
NILAI : RM 310,690.00
6. JPS WPKL (SH)/PLSK/25/2022
KERJA-KERJA MENAIKTARAF PADA STUKTUR LOG BOOM DI SG. BELONGKONG BAGI PROJEK RIVER OF LIFE (ROL) SERTA KERJA-KERJA BERKAITAN
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : OBW ENTERPRISE
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 16 MINGGU
NILAI : RM 209,610.00
7. JPS WPKL (SH)/PLSK/26/2022
KERJA-KERJA MENAIKTARAF PADA STRUKTUR LOG BOOM DI SG. BATU DAN SG. KERTAS BAGI PROJEK RIVER OF LIFE (ROL) SERTA KERJA-KERJA BERKAITAN
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : PADU GEMILANG ENTERPRISE
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 20 MINGGU
NILAI : RM 242,200.00
8. JPS WPKL (SH)/PLSK/27/2022
KERJA-KERJA MENAIKTARAF PADA STRUKTUR LOG BOOM DI KEROH 1 DAN KEROH 2 BAGI PROJEK RIVER OF LIFE (ROL) SERTA KERJA-KERJA BERKAITAN
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : FBI VENTURE
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 20 MINGGU
NILAI : RM 295,790.00
TARIKH IKLAN : 21 FEBRUARI 2022
1. JPS WPKL (SH)/PLSK/13/2022
KERJA-KERJA MENAIKTARAF SISTEM PAM KELODAK DAN KERJA-KERJA LAIN YANG BERKAITAN DI RWTP SUNGAI KEMENSAH
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : TAWARAN SEMULA
TARIKH KEPUTUSAN : APRIL 2022
2. JPS WPKL (SH)/PLSK/14/2022
KERJA-KERJA MENAIKTARAF SISTEM PAM KELODAK DAN KERJA-KERJA LAIN YANG BERKAITAN DI RWTP SUNGAI KLANG
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : WARISAN PADU ENTERPRISE
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 6 BULAN
NILAI : RM 475,180.00
TARIKH IKLAN : 22 FEBRUARI 2022
1. JPS WPKL (SH)/PLSK/08/2022
KERJA-KERJA PEMBERSIHAN DAN MEMBUANG KELODAK DI DALAM ROJI RAWATAN AIR DI DUA LOKASI JAJARAN SUNGAI KLANG SERTA KERJA-KERJA BERKAITAN BAGI MENINGKATKAN KUALITI AIR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : NAZZWORKS VENTURE
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 28 MINGGU
NILAI : RM 428,191.00
2. JPS WPKL (SH)/PLSK/22/2022
KERJA-KERJA PEMBERSIHAN DAN MEMBUANG KELODAK DI DALAM LOJI RAWATAN AIR DI DUA LOKASI JAJARAN SUNGAI KERAYONG SERTA KERJA-KERJA BERKAITAN BAGI MENINGKATKAN KUALITI AIR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : YOLO RESOURCES
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 28 MINGGU
NILAI : RM 383,540.00
3. JPS WPKL (SH)/PLSK/23/2022
KERJA-KERJA PEMBERSIHAN DAN MEMBUANG KELODAK DI DALAM LOJI RAWATAN AIR DI DUA LOKASI JAJARAN SUNGAI GOMBAK DAN SUNGAI KEROH SERTA KERJA-KERJA BERKAITAN BAGI MENINGKATKAN KUALITI AIR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : TAWARAN SEMULA
TARIKH KEPUTUSAN : APRIL 2022
TARIKH IKLAN : 24 FEBRUARI 2022
1. JPS WPKL (SH)/PLSK/09/2022
KERJA-KERJA MEMBINA, MENAIKTARAF DAN KERJA-KERJA PENYAMBUNGAN BEKALAN AIR SERTA KERJA BERKAITAN DI 9 PONDOK KAWALAN KESELAMATAN DI BAWAH PROJEK RIVER OF LIFE
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : NHI WORLD ENTERPRISE
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 12 MINGGU
NILAI : RM 126,594.00
TARIKH IKLAN : 25 FEBRUARI 2022
1. JPS WPKL (SH)/P/26/2022
KERJA MEMBAIKPULIH BERM TEBING KIRI SUNGAI KLANG BERHAMPIRAN JALAN SYED PUTRA, WILAYAH PERSEKUTUAN JALAN SYED PUTRA, WILAYAH PERSEKUTUAN KUALA LUMPUR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : CREDIBLE MEMBERS ENTERPRISE
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 3 BULAN
NILAI : RM 653,235.00
2. JPS WPKL (SH)/P/28/2022
KERJA MENGOREK DAN MEMBUANG KELODAK DI KOLAM TAKUNGAN BANJIR BUNUS DAN ONLINE STORAGE TITIWANGSA, WILAYAH PERSEKUTUAN KUALA LUMPUR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : GRAND MILIONE ENTERPRISE
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 16 MINGGU
NILAI : RM 655,800.00
3. JPS WPKL (SH)/P/29/2022
KERJA MEMBAIKPULIH BERM TEBING KANAN SUNGAI KLANG BERHAMPIRAN STESEN MONORAIL TUN SAMBANTHAN, WILAYAH PERSEKUTUAN KUALA LUMPUR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : SPECTRANICA SDN BHD
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 3 BULAN
NILAI : RM 654,797.00
TARIKH IKLAN : 28 FEBRUARI 2022
1. JPS WPKL (SH)/P/30/2022
KERJA MENGOREK DAN MEMBUANG KELODAK DI KOLAM TAKUNGAN BANJIR PUAH, WILAYAH PERSEKUTUAN KUALA LUMPUR
| IKLAN | JADUAL SEBUTHARGA (PRICE SCHEDULE) |
KONTRAKTOR YANG BERJAYA : RASS CONSTRUCTION SDN BHD
TARIKH KEPUTUSAN : APRIL 2022
TEMPOH SIAP : 3 BULAN
NILAI : RM 655,260.00